REPRESENTATIVE OFFICE IN YOUR REGION |
VMP Holding JSC |
Ekaterinburg, 25 Tkachey str., tel.: +7 343 357-30-97, +7 343 357-30-79 e-mail: office@fmp.ru |
VMP in social networks: | |
One-pack heat-resistant anticorrosive coating based on modified organosiloxane resin.
Used for protective-decorative painting of metal surfaces operating at temperatures from minus 60 to plus 600 °С in atmospheric conditions of different climatic regions, in the industrial atmosphere, and for decorative painting of mineral surfaces (concrete, reinforced concrete, brick and asbestos) inside buildings.
Used as an independent coating.
Certificate of state registration 66.01.40.015.Е.000054.10.10 dated 11.10.2010.
The Register of Oil Company Rosneft JSC.
Carbon steel
degrease the metal surface to the first grade according to GOST 9.402;
cleaning from scale, rust and traces of old paint to grade 2 according to GOST 9.402 (Sa 2 ½ or St 3 according to ISO 8501-1);
remove dust.
Stainless steel
degrease the metal surface to the first grade according to GOST 9.402;
make the surface rough manually or mechanically using sandpaper or non-metallic abrasive;
remove dust.
Concrete surface.
The surface must be evenly rough and free from protruding reinforcement, cracks, pits, shells, sags, chipped edges, oil stains, dirt and dust.
remove dirt, oil and grease;
remove lime (cement) milk, damaged or peeling concrete layers and old coating with abrasive cleaning, grinder or brushes;
remove dust;
repair cracks and chips.
The holding time of the concrete base concrete placing and before primer enamel application is to be at least 28 days; after using leveling compounds – in accordance with the regulatory documents of the compound manufacturer. The moisture content of the concrete in the 20 mm thick surface layer is not to be more than 4% (there should be no film moisture on the concrete surface; the concrete surface should be
air-dry to the touch).
The coating must be dry, clean and free of oil and dust before applying the subsequent layers.
The material is packed in metal buckets and cans.
Storage conditions in accordance with GOST 9980.5 (at ambient temperatures from minus 40 to plus 40 ° С). The container with the material must not be stored near hear sources and exposed to precipitation and direct sunlight.
Guaranteed storage life of the primer enamel is 12 months from the date of manufacture.
When working, one shall observe the corresponding industrial standards, requirements and safety measures indicated on the container label.
Use personal protective equipment (goggles, masks, respirators), avoid inhalation of thinners during evaporation and contact of the material or its components with skin, eye and respiratory ways mucous membrane; use the material indoors only with sufficient ventilation.
The material is flammable!
The information is of general character, without consideration to the object specific nature. Use of materials for other purposes not specified here or in case other influencing factors are present shall be approved by the VMP Holding CJSC in writing. In case of absence of such approval the manufacturer is not held liable for the improper use of the material and the buyer falls from the right to present claims connected with the coating quality.