REPRESENTATIVE OFFICE
IN YOUR REGION
VMP Holding JSC
Ekaterinburg,
25 Tkachey str.,

tel.: +7 343 357-30-97,
+7 343 357-30-79
e-mail: office@fmp.ru



VMP in social networks:

QUICK-DRYING
MATERIAL
ATMOSPHERE-RESISTANT
MATERIAL
HEAT-RESISTANT
MATERIAL
THICK-LAYERED
MATERIAL
FOR APPLICATION AT
NEGATIVE
TEMPERATURE
SINGLE-PACKED
MATERIAL
ST 2, ST 3 SURFACE
PREPARATION DEGREE
FOR USE AT
SEA AND FRESH
WATER
FOR USE WHEN
EXPOSED TO OIL
AND OIL PRODUCTS
ZINC-FILLED
MATERIAL
MATERIAL WITH
ANTICORROSIVE
PIGMENTS
MATERIAL WITH
CORROSION INHIBITOR
MATERIAL WITH
ANTISTATIC PROPERTIES
MainAnticorrosive protectionAnticorrosive materialsBY MATERIALPrimersVINICOR®-ecoprime-01 primer

VINICOR®-ecoprime-01 primer

VINICOR-ecoprime-01
TU 2312-002-67503963-2011
Epoxy primer
Double-packed
Colour: Gray, red-brown and other

Description

Double-packed  epoxy primer, hardened with amine-type hardener. It allows  to  get a thick coating, contains corrosion inhibitor.

Recommended use

  Anticorrosive  protection of new and repairable  carbon steel structures  exposed  to the  industrial atmosphere containing corrosive gases and vapors, short-term spills of acids, alkalis, oil products and used in atmospheric conditions of all macroclimate areas, atmosphere types and placement categories according to GOST 15150.

It is used as:

  • primer  in complex coating systems with VINICOR-62 (TU 20.30.12-001-54359536-2018), POLYTON-UR (UV) (TU 20.30.12-033-12288779-2018)  enamels,  with  VINICOR  (TU 20.30.12-001-54359536-2018), VINICOR-acryl  (TU 2312-005-67503963-2015), VINICOR-nord  (TU 2312-006-67503963-2012)  primer-enamels, as well as  other enamels and primer-enamels on vinyl-epoxy, epoxy acrylate and polyurethane bases;
  • independent coating.
It is allowed to apply  primer on consolidated residual corrosion products and/or old coatings based on alkyd, vinyl, epoxy-vinyl or epoxy materials.

Certificates, Approvals

State registration certificate No. RU. 78.01.05.008.Е.000397.05.15 dated 13.05.2015 It is approved by test centers: Scientific Industrial Holding “Lakokrasprotiye”; recommended for use by AO “Apatit”, JSC “Mondi SLPK”, PAO “AKRON”.

Surface preparation

  • degrease metal surface to 1 grade according to GOST 9.402;
  • minimum: power or hand tool cleaning from corrosion to 3 or 4 grade according to GOST 9.402 (St 2 according to ISO 8501-1).
  • recommended:  abrasive  blast  cleaning from scale, corrosion and old paint traces  to 2 gradeaccording to GOST 9.402 (Sa 2½ according to ISO 8501-1).
  • remove dust.
Before  the  second layer  application,  and before finishing enamel application,  the  coating  shall  be dry, clean, oil and dust shall be removed.

Application 

  • mix base thoroughly to homogenous condition before application;
  • with constant stirring, add a hardener to the base and mix thoroughly.  The mixing ratio  of the base and EN-14 hardener by mass 100:7.5;
  • if necessary, the composition should be diluted to the working viscosity;
  • holding time of the prepared material before application is 15-20 minutes covered with a lid.
When organizing painting works,  at temperature increase, it is necessary to consider the  pot  life decrease of applied material (after mixing the components).
The material is recommended to be applied in the plant and field conditions at temperature from minus  10 to  plus  35 °C  and  relative  air  humidity not more than 85  %. The temperature of the painted surface shall be above the dew point by at least 3 °C.

While  carrying out painting works below 0 °C, the thickness of one dry layer should be no more than 100 µm.
The primer is recommended to be applied in 1-2 layers using airless,  conventional  (air) spray,  by brush/roller.

The overlapping interval  between the layers of primer at temperature of plus 20 °C – not less than 5  hours.  Drying time depends on the temperature  of surface and ambient air, degree of dilution of the material, thickness of coating, efficiency of ventilation and relative air humidity.
Holding time  of the coating  before operating in aggressive conditions is not less than  7 days at temperature of (20±2) °С.

Storage and handling

The material  is delivered in packages: base and hardener packed in metal buckets and metal cans respectively depending on the set weight.
Storage conditions of primer components –  according to GOST 9980.5 (at temperature from minus 40 to plus 40 °C). The container shall be protected from atmospheric condensation and direct sunlight.
The  shelf life  is determined by warranty storage of the base (24 months) and hardener (12 months) starting with the manufacture date.

Precautions

When working with the  material,  one shall observe the existing sectoral standard norms and requirements and safety measures as specified on the package label.
One shall use personal protective equipment (goggles, face masks and respirators) and  avoid inhalation of thinners and contact of the composition or its components with skin, eye mucosa, respiratory channels; use inside the premises is allowed only in case sufficient ventilation is provided.
The material and its components (base and hardener) are fire-hazardous!
The hardened coating is not harmful to human health.

The information is of general character, without consideration to the object specific nature. Use of materials for other purposes not specified here or in case other influencing factors are present shall be approved by the  VMP Holding CJSC  in writing. In case of absence of such approval the manufacturer is not held liable for the improper use of the material and the buyer falls from the right to present claims connected with the coating quality

.

You can order products and get advice of how to use materials by calling: 8-800-500-54-00, +7 343 357-30-97, 385-79-00 or by sending an On-line request

You can also purchase products from official representatives of the VMP in Russian regions, countries of near and far abroad.