Oil and Gas Industry: registers of JSC Gazprom, Rosneft, Lukoil.
Transport construction: STO-01393674-007-2022 Central Research Institute of Construction JSC; STO 12288779-001-2020 State Company Avtodor; accreditation of Russian Railways JSCO, standard technological regulations for the anticorrosive protection of metal superstructures of new railway bridges 12288779.02073.00160.
Industrial and civil construction: recommended to the application according to GOST 9.401, RD GM-02-18 Trest Gidromontazh, recommendations of NIKIMT-Atomsgroi JSC for use in nuclear power plants, MMC Norilsk Nickel.
Approvals: Lacquer Coating Research Institute, Khotkovo town; Institute for Corrosion Protection Dresden, (Germany), All-Russian Scientific Research Institute of Railway Transport, Central scientific Research Institute of Construction, Central Marine Research and Design Institute, Institute of Ecology and Evolution Problems RAS named after A.N. Severtsov (Russian-Vietnamese Research and Technology Center, Nyachang, SIC, Sochi, CIS, Severomorsk).
perform abrasive blasting cleaning of scale, rust and traces of old paint to not less than 2 grade according to GOST 9.402 or Sa 2 1/2 ISO 8501-1 with a roughening of 30-50 μm (between segments 1 and 2. but lower of G comparator ISO 8503-2). Application on a smooth surface is not allowed;
The hardening time is recommended as an approximate for practical painting. Hardening time depends on the surface temperature and ambient air, the dilution ratio of the material, the coating thickness, the efficiency of ventilation and the relative air humidity.
The drying time "to turning over, handling ", "to stackable" depends also on the design features of metal structures (the number of support points, sling arrangements, metal structures fasteners for further transportation) and may differ from those indicated. It should be determined by test coloring for specific conditions.
The maximum overcoating interval is not more than 1 year. The holding time at a temperature of 20 °C before packing and shipping – at least 24 hours, before the operation in severe environments is not less than 7 days.
ZINEP is supplied as the Base in 10 and 1 litre metal containers and the hardener
in 3 and 0.25 litre metal containers.
Storage conditions – according to GOST 9980.5 (at air temperature from minus 40 to plus 40 °C). The material components shall be stored away from heat sources, the container shall be protected from direct sunlight (short-term impact, not more than 3 hours, is acceptable) and atmospheric condensation.
The shelf life of the components is 18 months starting with the date of manufacture.
When working with ZINEP one shall observe the existing sectoral standard norms and requirements and safety measures as specified on the package label.
One shall use personal protective equipment (goggles, face masks and respirators) and avoid inhalation of solvents and contact of the composition substances with skin, eye mucosa, respiratory channels; use inside the premises is allowed only in case sufficient ventilation is provided.
It is classified as fire-hazardous material.